destructive sampling happened in two phases: after the albedo measurements (plus photos and snow depth, as usual) in the morning slot, NIR images and SMP measurements and additional photos were taken. also, NIR over snow targets was done. in the afternoon slot, another pass with snow depth, ice/pond thickness drilling and optics cores was done.